ThistlePro® FastSet Finish Installation Instructions

The guidance below shows how to apply ThistlePro® FastSet Finish plaster – All times stated are approximate.

The guaranteed way to get the job done faster.

Installation Guidance
British-Gypsum-Suresh-Patel-Installation-L-01

0 mins

  • Add approx 11.5 litres of clean water per 25kg bag to mixing bucket. Gradually add the plaster to water whilst mixing.
British-Gypsum-Kirkby-Thore-Services-L-108
  • Complete 1st coat (1mm thick)
British-Gypsum-Kirkby-Thore-Services-L-182

10 -15 mins

  • Complete 2nd coat (1mm thick), the total thickness for both coats should be a minimum of 2mm
British-Gypsum-Suresh-Patel-Installation-L-02

15 - 25 mins

  • Closing in
British-Gypsum-Manchester-Services-L-03

35 mins

  • 1st trowel

45 mins

  • 2nd trowel
British-Gypsum-Manchester-Services-L-03

70 mins

  • Final trowel to a flat, matt finish (Lubricated with minimal water)
British-Gypsum-Suresh-Patel-Installation-L-01
British-Gypsum-Kirkby-Thore-Services-L-108
British-Gypsum-Kirkby-Thore-Services-L-182
British-Gypsum-Suresh-Patel-Installation-L-02
British-Gypsum-Manchester-Services-L-03
British-Gypsum-Manchester-Services-L-03

Times and processes are given as guidance. On site practice may vary. Finishing times are reduced by suction and extended by cold weather conditions.

NOTE: For ThistlePro® FastSet Finish, we recommend a single mix for both first and second coat. Ensure that the product is suitable for the background to which it is being applied by using the Plaster Selector Guide.