Thistle MultiFinish Installation Instructions

Our guidance below shows the recommended way to apply Thistle MultiFinish. All times stated are approximate.

Get an excellent finish, whatever the background with Thistle MultiFinish.

Installation Guidance
British-Gypsum-Suresh-Patel-Installation-L-01

0 mins

  • Add approx. 11.5 litres of clean water per 25kg bag to mixing bucket. Gradually add the plaster while mixing
  • Complete 1st coat (1mm thick)
British-Gypsum-Kirkby-Thore-Services-L-182

20 - 45 mins

  • Complete 2nd coat, the total thickness for both coats should be a minimum of 2mm

45 - 60 mins

  • Closing in
British-Gypsum-Suresh-Patel-Installation-L-02

90 mins

  • 1st trowel

100 mins

  • 2nd trowel
British-Gypsum-Manchester-Services-L-03

120 mins

  • Final trowel to a matt finish (lubricated with minimal water)
British-Gypsum-Suresh-Patel-Installation-L-01
British-Gypsum-Kirkby-Thore-Services-L-182
British-Gypsum-Suresh-Patel-Installation-L-02
British-Gypsum-Manchester-Services-L-03

Times and processes are given as guidance. On site practice may vary. Finishing times are reduced by suction and extended by cold weather conditions.

Note: Ensure that the product is suitable for the background to which it is being applied by using the Thistle Plaster Selector Guide.