Image

FAQs

Below you’ll find all of the information needed to complete wall lining, partition, floor and ceiling systems, no matter the size and complexity of the project specification.
245 results

Site Dust

During installation of British Gypsum products dust may be generated.  Any dust (regardless of chemical composition) is considered to be a substance hazardous to health under COSHH if it is present at a concentration in air equal or greater than 10mg/m3 (for inhalable dust) or 4mg/m3 (for respirable dust).

View more

Honey bees boost biodiversity at Fauld

Six new honey bee hives are helping to boost biodiversity near our mine in Fauld.

View more

Which side of the board should face outwards?

For all Gyproc plasterboards, the coloured paper face should face outwards and is the side suitable for plastering or direct decoration.

View more

What is the difference between BS and BS EN fire resistance test standards for plasterboard partitions?

BS EN 1363-1 better replicates the way a dry lining system is installed on site. In a BS 476-20 fire test, partitions are generally constructed to no more than 3m in height. The standard allows for maximum partition heights above 3m to be based on a ‘cold-state’, without the need to test at the heights they could be installed at on site.

View more

Can I reduce stud centres to increase the maximum height of a partition?

For partitions where no fire rating is required, or where specified to BS 476: Part 22, the maximum system height is limited to the cold state height (L/240@200Pa.) Refer to the following Technical Guidance Note.

View more

Can I use the moisture resistant version of a board and still achieve the same performance?

Where moisture resistance is required in a British Gypsum partition, lining or ceiling, the moisture-resistant version of a board, in the same thickness as the original specification, can be used without impacting the system performance.

View more

How do I install service penetrations in British Gypsum systems?

If services are required to penetrate a British Gypsum system, the system performances must be maintained. This includes fire resistance, acoustic separation and structural integrity.

View more

New product sets 50% faster than standard skim finish plaster

Introducing our latest high-performance skim finish plaster, ThistlePro® FastSet Finish.

View more

Cutting CO2 emissions at our mines

Two of our mines have made changes that will cut CO2 by 175 tonnes combined each year.

View more