Below you’ll find all of the information needed to complete wall lining, partition, floor and ceiling systems, no matter the size and complexity of the project specification.
The plan for restoring the site once quarrying operations have finished is influenced by the availability of on-site materials and the need to prepare the site for future LDO development.
A Local Development Order (LDO) was approved by Rushcliffe Borough Council on 13th July 2023. This sets out plans for redevelopment of the Ratcliffe on Soar Power Station site when the operation closes at the end of September 2024.
Glasroc F FireCase or Glasroc F MultiBoard and Gyproc Moisture Resistant (MR) grade boards (e.g. Gyproc FireLine MR) are suitable linings for semi-exposed ceilings providing the boards are protected from direct weathering and driving rain.