Image

FAQs
Below you’ll find all of the information needed to complete wall lining, partition, floor and ceiling systems, no matter the size and complexity of the project specification.
Filter your results
Product Family
Product/System Performance
Building Element
4 results
Can I use the moisture resistant version of a board and still achieve the same performance?
Where moisture resistance is required in a British Gypsum partition, lining or ceiling, the moisture-resistant version of a board, in the same thickness as the original specification, can be used without impacting the system performance.
How do I install service penetrations in British Gypsum systems?
If services are required to penetrate a British Gypsum system, the system performances must be maintained. This includes fire resistance, acoustic separation and structural integrity.
What head and base tracks should I use?
The type of head and base track you need is detailed in the Technical Specification document for the solution you choose. The head track may also change dependent on deflection head requirements.
What is a deflection head?
There are details used at the top of partition systems when needing to allow for structural movement of the floor or roof above.