"Solution Product Name","Solution Product Description","Last review date","Last updated date","Abutment Fixing","Approx. Weight (kg/m2)","Base Channel Fixing",Clips,"Dropped Soffit","Deflection Allowance","Finishing Requirements","Fire Insulation (mins)","Fire Integrity (mins)","Fixing Strap","Maximum Height","Maximum Height (mm)","Other Requirements",Screw,Sealant,"Stud Centres (mm)","Clip fixing","External insulation, Layer 1","External board joints","Head channel","Base channel","Fixing strap","Insulation, Layer 1",Sealant,Clips,"Abutments and openings","Screws side 2, Layer 1","Screws side 1, Layer 1","Screws side 1, Layer 2",Stud,"Board side 2, Layer 1","Board side 1, Layer 1","Board side 1, Layer 2" "T106026 (EN)","A non-loadbearing external wall construction including a 20mm deflection head with an Inner layer of Glasroc X Sheathing Board 12.5mm and outer layer of 50mm Isover Polterm Max Plus insulation to external side and two layers of Gyproc SoundBloc 15mm to the internal side of 70mm SFS framework. 50mm Isover Acoustic Partition Roll (APR 1200) in the cavity. For heights up to 4000mm.",17.08.2022,02.02.2024,"SFS stud (70mm x 50mm x 1.2mm) suitably fixed to structure at 600mm centres.",45,"SFS channel (75mm x 38mm x 1.2mm) suitably fixed to floor at 600mm centres. All SFS components are supplied direct from Hadley Group.","Fix the slip klip component to the head channel with four British Gypsum Wafer Head Jack-Point Screws 13mm.","For principles of deflection head construction refer to detail ST‐225-ZZL2-01","For vertical movement up to 20mm. To be determined by a Structural Engineer.","To achieve the specified performances, the system should be finished using either one of our Thistle or ThistlePro plasters, or Gyproc jointing products to the internal face. See the product range guides on the British Gypsum website for more information.",90,90,"Used to support horizontal board joints to internal side and enable board screw fixing at 300mm centres.","The maximum heights quoted are limited by the fire state field of application or by limiting deflection of L/240 at 200 Pa, whichever is the lower of the two.",4000,"SpecSure® system performance warranty confirms that British Gypsum proprietary systems will perform as specified for the lifetime of the building. The SpecSure® warranty requires that all components are specified in full and constructed in accordance with British Gypsum’s installation guidance. For more details see the British Gypsum website. Always check with the design team before making any changes to the chosen specification, ensuring appropriate substantiation is sought to confirm that the solution still meets all required project performances.","Board side 1, Layer 1 (inner), fix securely to SFS supports around the perimeter of the board at maximum 300mm centres except the head channel; Board side 1, Layer 2 (outer), fix securely to all SFS supports around the perimeter of the board and intermediate stud positions at maximum 300mm centres except the head channel. The uppermost board fixings are positioned 130mm below the structural soffit through board in to fixing strap. Board side 2, Layer 1, fix securely to all SFS supports around the perimeter of the board and intermediate stud positions at maximum 300mm centres except the head channel. The uppermost board fixings are positioned 130mm below the structural soffit. External corners reduce fixings to 200mm. All joints staggered between layers. First fixing of the external board into the stud should be 100mm above the floor channel leg and then fixed working up the stud (board side 2). Fix working from the centre of each board on the internal side (board side 1). Position screws not less than 13mm from cut edges and 10mm from bound edges of boards. Set screw heads flush with plasterboard surface; do not break gypsum core.","On the internal side, locate sealant at junctions with adjoining structure and other air paths. Apply as a continuous bead to clean, dry, dust-free surfaces, leaving no gaps. After application of sealant, bulk fill gaps between floor and underside of plasterboard using Gyproc joint compound.",600,"British Gypsum Wafer Head Jack-Point Screws 13mm","50mm Isover Polterm Max Plus","Glasroc X Sealant","75mm Hadley SFS Channel","75mm Hadley SFS Channel","Gypframe GFS1 Fixing Strap","50mm Isover Acoustic Partition Roll (APR 1200)","Gyproc Sealant","SFS Hadley Slip Klip","70mm Hadley SFS Stud","Glasroc X Screws 25mm","British Gypsum Jack-Point Screws 25mm","British Gypsum Jack-Point Screws 41mm","70mm Hadley SFS Stud","Glasroc X Sheathing Board 12.5mm","Gyproc SoundBloc 15mm","Gyproc SoundBloc 15mm"