Solution
The solution was a custom designed 2m high partition incorporating a 30mm panel of Gypframe Security Sheet, faced on each side with 20mm Glasroc FireCase F fire protection board. The partition was secured at floor level and to the adjoining wall with British Gypsum's angle section, and each wall has a tiled external finish. To satisfy the stringent impact resistance criteria, a test wall of 3 toilet cubicles was installed in a "mock-up" on site, which were then subject to a series of severe impact tests by architects simulating acts of vandalism. The test wall survived these sustained attacks without damage.