By working closely with the main contractor, British Gypsum reduced the plasterboard waste usually found from on-site cutting of standard boards and metals by providing bespoke lengths of product, specific to the project requirements.
OUTCOMES
Working in collaboration resulted in the following savings:
- 35% reduction in material costs
- 20% reduction in metal wastage
- 20% reduction in plasterboard wastage
- 34kg CO2 removed
- Reduction in risk of cuts, trips and falls