Solution
The solution was to use a GypWall AUDIO twin frame high performance separating wall, lined with 1 layer of 19mm Gyproc Plank and 1 layer of 15mm Gyproc SoundBloc. This solution also incorporated 100mm Isover General Purpose Roll insulation.
This solution, along with other systems specified to meet a complicated mix of aesthetic and practical performance requirements, was extensively tested and approved by the architectural team.
Main Contractor: Laing Management
Subcontractor: Peter Walker Group
Architect: BDP, Glasgow