The Petronas Twin Towers

Kuala Lumpur

The Petronas Twin Towers

Main Focus

The main focus of the project was to provide 2 hour fire rated shafts capable of handling pressure loadings created by high speed lifts in a fast track building 484 metres high. The speed of the construction programme required the shafts to be constructed from one side.

Challenge

The challenge was to provide construction and design support from the UK for the contractor based on site in Malaysia and to supply the metal framework components to a schedule commensurate to a fast track project.

Solution

The solution was to utilise the assistance of British Gypsum's International Projects Team and provide a rapid technical response service through fax links with site. During the construction phase only one face-to-face meeting with construction personnel took place in the UK.

ShaftWall metal components were supplied from the UK and the plasterboard supplied under licence in Malaysia by Boral Wembley Gypsum. Extensive use was made, in the initial stages, of British Gypsum's NAMAS approved fire testing facilities based at East Leake in Leicestershire.

International co-operation on a grand scale

Main Contractor: API Contracts
Subcontractor: Mayjaus
Architect: Assocs, Toronto