Rank Odeon Multi-plex Cinema

Phoenix Park, Bradford

Rank Odeon MultiPlex Cinema

Main Focus

The main focus of the project was to meet the high acoustic and fire protection performance criteria for this new 13-screen cinema complex.

Challenge

The challenge was that none of the twin frame walls should be rigidly braced together, in order to achieve ultimate structural isolation. As this is structurally inadvisable, the challenge was to provide some new form of acoustic brace that would reduce the sound loss that might be generated by use of standard rigid bracing.

Solution

The solution was to utilise GypWall AUDIO twin frame high performance wall, clad with 3 layers of 15mm Gyproc SoundBloc and Isover General Purpose Roll in the cavity. In conjunction with William Gower and Ove Arup Acoustic Consultants, British Gypsum developed a new Gypframe Acoustic Brace which then underwent intensive testing at the Building Test Centre and achieved the designers requirements for maximum acoustic isolation, whilst maintaining the structural integrity of the system.

Development of new acoustic brace for maximum acoustic isolation

Main Contractor: Tolent Construction
Subcontractor: William Gower & Partners
Architect: Arup Acoustics