Main Focus
The main focus of the project was a complete renovation,
following a disastrous fire at the school that completely destroyed
the roof and caused smoke-related damage to the interior.
Challenge
The challenge was to address the most complex element of
the repair and rebuild the ceiling of the main hall. This ceiling
features a span of 30 metres, with a 4.9 metre radius, and five
arched windows cut out of each side. The ceiling was vaulted,
similar to that of a church, making it a complicated shape to
recreate.
Solution
To erect a framework using a CasoLine MF suspended ceiling system fixed to the
soffit, using strap hangars. This framework was then lined out,
using Glasroc MultiBoard and Gyproc WallBoard.
Glasroc MultiBoard was an ideal choice to recreate the curvature
of the ceiling, due to its inherent flexibility.
British Gypsum provided a full specification, together with CAD
drawings for the ceiling, which was particularly valuable in areas
around the windows reveals.
Main Contractor: Weaver
Subcontractor: Ace Partitions
Architect: York City Council