Fitness First Leisure Centre

York

Fitness First Leisure Centre

Main Focus

The main focus of the project was the internal fit out of a new leisure centre in York, occupying over 20,000 m2 on two levels.

Challenge

The challenge was to achieve durability and meet other performance criteria with floor to ceiling partitioning of 8 metres, with a curved surface division wall above the spa in the main atrium. Additional partitioning was required to delineate between the various function rooms.

Solution

The solution was to construct the internal walls using the GypWall CLASSIC stud partitioning system (146mm 'Jumbo' studs) lined each side with two layers of 6mm Glasroc MultiBoard, a non combustible, inherently flexible, glass reinforced gypsum board, which copes easily with the desired curved effect of this application.

Main Contractor: Oldfield Watson, Hebden Bridge
Subcontractor: DGR Joinery
Architect: Billingham Design

Back to Showcase Selector

Back to Showcase Selector

Fitness First Leisure Centre

Products featured

GypWall CLASSIC

Glasroc MultiBoard

Fire Rating 1 hour
Sound 53 db

GypWall CLASSIC